For neighbours and the city
What is proposed for the block
Chestnut Commons is a proposal for the block bounded by Gainesville Street, W. Chestnut Street and W. Pine Street. This page sets out what is planned, what it would look like from the street, and where we post updates. It is news, not a sales pitch.
What is proposed
Nine new houses
- Five new detached homes facing W. Chestnut Street, on lots about 65 feet wide.
- Four new detached homes facing W. Pine Street, on lots about 43 feet wide.
- The new homes are two storeys, each with its own garage and driveway, front yards with planting, and street trees along the frontage.
- New curb, gutter and sidewalk along the street frontages.
These are proposals. The plans are still in design and are subject to the City of Flowery Branch's review and permits, so details on this page can change. We will post changes here.
Today and as proposed
The same view, before and after
Each pair is taken from the same camera in our 3D model of the block: first as it is today, then with the proposed homes. Drag the handle to compare.


Artist's rendering. The block from above, looking north-west: today, and as proposed from the same camera. From the illustrative 3D site model; not a survey; neighbouring buildings are approximate.


Artist's rendering. W. Pine Street: today, and as proposed from the same spot. From the illustrative 3D site model; not a survey; neighbouring buildings are approximate.
Want to look around yourself? Walk the block in 3D (opens a 3D model; best on Wi-Fi).
Trees and planting
New street trees and yards
The proposal plants new street trees along the W. Chestnut and W. Pine frontages, with lawns, foundation planting and a tree in each front yard. Which of the existing trees on the block can be kept will be shown on the site plan, and we will publish it here when it is ready.
Timeline
Dates to be announced
There are no dates yet. We will post each step here; once neighbour sign-ups open, updates will also go out by email when something changes.
- Design and city review To be announcedPlans and the site plan go to the City of Flowery Branch.
- Site work To be announcedUtilities, curb, sidewalk and grading. Working hours and traffic arrangements will be posted before work starts.
- Building the homes To be announcedThe houses go up, followed by planting and street trees.
Questions
Questions and answers
Something we have not answered? There is no way to send us a question through this site yet; one opens with the neighbour sign-ups. Until then, we add answers here as the plans firm up.
Is this definitely happening?
It is a proposal. The plans are still in design and need the city's review and permits before any work starts. If the plans change, this page will change with them.
How big are the new homes?
Two storeys. The model home has four bedrooms, two and a half baths and about 2,146 heated square feet, with a two-car garage. The W. Chestnut homes sit on lots about 65 feet wide and the W. Pine homes on lots about 43 feet wide.
Where will people park?
Each new home has its own garage and driveway.
Will the trees along the street go?
New street trees are part of the proposal. Which existing trees can be kept will be shown on the site plan, which we will publish here.
When would construction start, and what hours?
To be announced. Working hours and any traffic arrangements will be posted here before work starts, and sent by email too once neighbour sign-ups open.
How do I reach the team?
Not through this site yet. Neighbour sign-ups open soon, and we plan to give the sign-up form room for a question. Neighbour updates will be project news only. We will not use that list for sales follow-up.
Neighbour updates
Project news by email, soon.
Neighbour sign-ups open soon: occasional updates on the plans, the city's review and the timetable, with no sales follow-up. Until then, we post the news on this page.